06/30 2010
Building Automation Controls - 5.0 out of 5 based on 7 votes
Generally, building automation begins with control of mechanical, electrical, and plumbing (MEP) systems. For instance, the heating, ventilation, and air-conditioning (HVAC) system is almost always controlled, including control of its various pieces of equipment such as:
- Chillers
- Boilers
- Air Handling Units (AHUs)
- Roof-top Units (RTUs)
- Fan Coil Units (FCUs)
- Heat Pump Units (HPUs)
- Variable Air Volume boxes (VAVs)
- Lighting control
- Power monitoring
- Security Systems
- Close circuit video (CCTV)
- Card and keypad access
- Fire alarm system
- Elevators/escalators
- Pipes & Drainage Systems
- Plumbing and water monitoring
- and lost more systems
Read 1135 times Last modified on Tuesday, 30 June 2015 23:29
XTEC
CEO & Founder